Our current manufacturing facility was built on a five acre site at Buckingham in 1991. The plant is laid out to provide logical workflow through the full range of processes.
The 78,000 sq ft building provides an ideal working environment, with temperature controlled air flow and large amounts of natural light. The spacious open plan arrangement allows a high degree of flexibility to cater for changing requirements or special projects.
Careful attention has been paid to finishing areas to ensure clean conditions for high-quality production, operator safety and environmental acceptability.